The HOTNAT criteria at a glance:
- The missed connection must be between two high-speed trains within the Railteam alliance
- Your previous train is delayed or cancelled
- The change takes place at a Railteam hub (Paris, Brussels, Cologne, Munich, Basel, Zurich) or larger connecting station.
